The dining room in a 3D model of a customer's house at night, with two pendant lights over the table
Processes

Getting sockets, switches and lights decided before first fix

Customers put off choosing where their sockets, switches and lights go, then change their minds once the walls are plastered. Here's what that costs a builder, and the tool I've built to get those choices made at home before work starts.

Ask a customer where they want their sockets and they'll usually give you an answer. Ask them again once the plaster's dry and there's a fair chance the answer has changed. Most people can't picture a room from a drawing, so the real decisions get made on site, in a hurry, or after the work is already done.

I've built a tool that moves those decisions to the customer's kitchen table, before anyone picks up a drill. This article covers the problem it's meant to solve, what it changes for a contractor, and what each part of it does.

Slow decisions hold up both sides of the job

Customer indecision costs you time and margin. While people deliberate over sockets, switches and lighting, you can't get through the work you have at the pace you want.

For your customers

  • They're asked to place every socket, switch and light from a drawing they can't easily picture.
  • The questions come on site, so answers get made on the spot.
  • A rushed choice often isn't what they want once the walls are plastered, and changing it then costs them money and time.
  • They end up feeling rushed in their own home instead of in control of it.

For you

  • Trades wait on site, or get moved to another job, while a customer decides.
  • Changes after first fix mean chasing walls, re-running cable and making good, and that eats into your margin.
  • Hours go on calls and messages chasing the same answers.
  • A job that runs late and over budget colours how the customer sees you, even when the delay was theirs.

What changes when choices are made before work starts

When customers make their choices at home before work starts, the job runs from a schedule instead of a string of conversations on site.

  • Less time waiting on decisions. Your electrician arrives with a schedule and nobody stands idle while a customer decides.
  • Less rework after first fix. Chasing walls, re-running cable and making good all come out of your margin. Settling decisions early removes a lot of the reasons for it.
  • One list for every trade. Everyone works from the same schedule, so less falls through the gaps and you spend fewer evenings on the phone confirming socket heights.
  • Customers who feel looked after. They see their rooms before they're built, so they feel in control of the job instead of being put on the spot.

The electrics plan

Your customer places each socket, switch, light and data point on a scale floor plan of their rooms. You get back a schedule your electrician can work from, so the questions usually asked on site are answered before they arrive.

What the plan covers:

  • A scale floor plan of each room
  • Sockets, switches, lights and data points placed by the customer
  • The height, purpose and notes for every point
  • Which switch controls which light, one-way or two-way
  • A lighting circuit schedule for the electrician
  • The data network across floors, with every cable run listed
  • Each device matched to the socket that powers it

Sockets, switches and lighting

Floor plan of three ground floor rooms with sockets, switches, lights and data points marked, and a count of each type by room
The customer marks each socket, switch, light and data point on a scale plan, with a count of each type by room.
Diagram of two light switches in a lounge, each wired to the same two ceiling lights
Each switch is linked to the lights it controls. Here, two switches in the lounge both control the same pair of ceiling lights.
Details panel for one light switch showing its height from the floor, what it is for and the lights it controls
Every point carries its height from the floor, what it's for and any notes.
Table of lighting circuits listing which switch controls which lights and whether the switching is one-way or two-way
The lighting circuit schedule shows which switch controls which lights, and whether each is one-way or two-way.

Data and devices

Diagram of a home data network across two floors showing the router, network switch, access point and the cable runs between rooms
The data network across both floors, with the router, network switch, access point and the cable runs between rooms.
Close-up of the network diagram for one room showing a router, data points, a television and sockets joined by cables
A closer look at one room: the router, data points, television and sockets, and the cables that join them.
Table of network cable runs listing where each starts, where it ends and the route it takes
Every network cable run, with where it starts, where it ends and the route it takes.
Table matching each device to the room it is in and the socket outlet that powers it
Each device matched to its room and the socket that powers it.

The 3D model

Customers walk round a 3D model of their rooms and try wall colours, floors and woodwork, room by room, from above and from standing height. Seeing a choice in place before committing to it should mean fewer of those choices get revisited halfway through the job.

What the model covers:

  • A walk-round 3D model of the customer's own rooms
  • Wall colours, floors and woodwork chosen room by room
  • Every room viewed from above or from standing height
  • A night view showing rooms and outside lights switched on

Inside the model

Three dimensional model of ground floor rooms with a panel for choosing wall colour, flooring and woodwork
Wall colour, flooring and woodwork are chosen room by room from a panel beside the model.
The model seen from standing height inside a room, with a coloured wall, pendant lights and a wooden floor
The same model from standing height, with the wall colour, pendant lights and wooden floor in place.
Three dimensional model of a first floor office seen from above, with roof lights and glazed doors
Any room can be viewed from above. This is a first floor office with roof lights and glazed doors.

After dark

Switching the model to night shows each room, and the outside of the house, with the lights on. Customers can judge where every light sits before a single cable goes in.

The first floor of the 3D model at night seen from above, with a pendant light over the bed and ceiling lights on the landing by the stairs
The first floor at night, from above. You can see where the light falls in the bedroom and on the landing.
The dining room in the 3D model at night from standing height, with two pendant lights over the table and a panelled blue wall
The dining room after dark. The two pendants can be checked against the table before anything is wired.
The outside of the 3D model at night with three wall lights lit and the rooms visible through the windows and glazed doors
Outside at night. The wall lights show how the outside of the house will be lit.

Are customer decisions holding up your jobs?

If you've had a trade waiting on a customer, or redone work after first fix because they changed their mind, ring me on 07980 900 480 or book a call. I'll show you the tool working on a real house.

Ready to transform your business?

Book a FREE discovery call and get a clear roadmap for your next stage of growth.

Finding the root cause, then fixing it. Lake District based, working across Cumbria and North Lancashire.

© 2026 Xtreme Exposures Ltd